Product Description

The S fitting is used to provide a continuous handrail around a wall. This can be ordered in any of our handrail profiles (option 1). The S fitting helps homes provide an attractive way to be compliant with stairway codes.

Secondary Option refers to the center to center offset dimension. A 6″ Offset is the most common offset based on standard wall widths.

If you need a different offset place your order over the phone, or add notes during the checkout process.

7047-R – fits 6010 profile handrail
7247-R – fits 6210 profile handrail
7647-R – fits 6610 profile handrail
7747-R – fits 6710 profile handrail
7847-R – fits 6800 profile handrail

StairSupplies guarantees the tolerance on our fittings to match our handrail within 1/32″ (will be within 1/32″, once centered on the handrail). Please be aware that the part numbers on our handrail & fittings are industry standard numbers, but the actual profiles can vary from one supplier to another. For example, we do not guarantee that our 6010 profile will match 6010 profile you purchased elsewhere. Let us know if you have additional questions about this policy.

Product Specifications

 

Wood Grain & Color Variation

At StairSuppliesTM we strive to match the grain and color of all of our wood products as closely as possible. However, due to the natural character of wood products, there may be instances in which a perfect grain and color match is not possible. By ordering from StairSuppliesTM, you acknowledge that there may be some variation in the grain and color of your wood products.

Interior Use Only

This product may contain glue joints and is designed for interior use only.

Product Q&A


Guest
Bernie
8 years 8 months ago

What is the total length

Guest
StairSupplies
8 years 8 months ago

Bernie,

The total length is 11″.

Guest
Dale Peters
7 years 1 month ago

How to you determine the offset and how to you fastened to the handrail

Guest
StairSupplies
7 years 17 days ago

Thanks for the question Dale.

The offset is measured from the center of one end versus the center of the other end of the S curve. See the diagram at:

S Curve Offset

To attach to a handrail, use our S-9000 Rail Bolt Kit

Best,

StairSupplies Customer Support

Guest
James
7 years 29 days ago

whats the difference between left and right

Guest
StairSupplies
7 years 17 days ago

If you look at them side-by-side you can see that the Right bends to the right=hand side and the left bends to the left.